XC918EV (EV)

Factory, Concrete plant, Asphalt plant, Sand vendor

Operation Weight

6500 kg

Battery

LFP 173 Ah

Gross Power

64 / 128 kW

Contact Us
Share :

Special Feature

It supports Fast Charging with 2 ports, and the average charging time is 1 hour, with continuous operation of up to 6-10 hours depending on working conditions and environmental factors.

Compared to oil-powered forklifts, it can save up to 70% of energy and reduce costs by more than 55%.

The newly designed driver's cabin increases space, reduces noise and dust, and allows for more comfortable extended periods of operation. It also features a wider view, redesigned air conditioning system, and various buttons to cater to the driver's work requirements.

Video

YouTube video
YouTube video
YouTube video

Similar Products

Contact Information
Quotation Form (EN)